Fleet & operations

Capacity that moves with the programme.

Production plants, delivery vehicles, pumping resources, support fleet and people are coordinated through a central operating function.

Resource platform

Production, placement and support.

The published fleet reflects the integrated resources planned for high-volume concrete supply and site support across Dubai.

ResourceQuantityCapacity / specificationOperating role
Automated batching plants4200 m³/hour eachComputer-controlled ready-mix concrete production
Transit mixers6012 m³ eachScheduled delivery from plant to project site
Boom pumps1042–70 m reach rangeMobile pumping for reach and high-output placement
Placing pumps10Project-specific placing configurationSite placement support for defined pour arrangements
Stationary concrete pumps5High-output stationary configurationFixed pumping arrangements and sustained placement
Ice Plant System1Approx. 120 tons/dayIce production for temperature-controlled concrete
Chilled-Water Plant1Approx. 400 m³/day, including storage & pumping systemChilled-water supply for controlled concrete temperature
Aggregate Tipper Semi-Trailer Sets156×4 tractor head + 3-axle, 45 m³ rear-tipping semi-trailerAggregate transport and plant supply logistics
Bulk Cement Tanker Sets5Tractor + 50–60 m³ pneumatic bulk cement tankerBulk cement transport and silo replenishment
Wheel Loaders2Approx. 5-ton payload / 3 m³ bucketPlant-yard and aggregate material handling
Technician Pickup Trucks101.5-ton class, for pump/site technical supportTools, maintenance and rapid technical response
Staff buses345 seats eachWorkforce transport
Minibuses314 seats eachTechnical and operational team transport
Administrative & technical vehicles25Mixed light-vehicle fleetManagement, supervision and technical support
Total workforce250Skilled, general, administrative and technical personnelProduction, delivery, HSE, customer support and corporate functions
IMDAD dispatch and fleet coordination centre

Central dispatch

Resources are valuable only when coordinated.

The dispatch function connects batching, mixer allocation, route conditions, site readiness and pumping availability. This helps maintain delivery sequence and respond quickly when site conditions change.

  • Order and batching schedule visibility
  • Mixer assignment and delivery sequencing
  • Pump allocation and site coordination
  • Operational communication across the supply chain
Concrete mixer maintenance workshop

Fleet readiness

Maintenance supports delivery reliability.

Preventive maintenance, inspection and workshop support are essential to fleet availability. Planned maintenance helps protect vehicle condition, reduce disruption and keep production assets connected to the project site.